Process and water treatment · 2025–2026
Novonesis
30+ tie-ins in a live plant
Tie-in manager · Kalundborg, Denmark / Poland
Responsible for 30+ tie-ins between the existing plant and new systems, carried out during operation with minimal disruption – as part of a wastewater treatment expansion worth more than DKK 2 billion.
- Planned local plant shutdowns with a focus on safety, in close cooperation with operations
- Managed 5 contractors and suppliers across piping, electrical and automation
- Coordinated detailed design and fabrication of pipe components at Eurosteel in Poland
- Walkdowns, P&ID reviews and quality assurance of critical installations
- Turned the basic design into a prioritised plan with a visual overview
