Skip to content
RAS-CON

Available for new assignments from 1 December 2026

Technical project management from idea to commissioning

I'm David Enggaard Pedersen, a project manager and mechanical engineer with 13 years of experience from process and water treatment plants, land-based aquaculture, the wind industry and special machinery in Denmark, Norway, the USA, Poland and China. I'm brought in where a project lacks momentum, technical overview and a shared direction.

David Enggaard Pedersen, Project manager · BEng, Mechanical Engineering
The project phases from idea to operation – I work from idea to commissioningWHERE I COME IN01IdeaNeed02DevelopConcept · budget03TenderSpec · contract04ExecuteControl · QA05OperateOptimise13 YEARS · DK · NO · US · PL · CN
as an engineer and project manager
13 years
as an engineer and project manager
Denmark, Norway, the USA, Poland and China
5 countries
Denmark, Norway, the USA, Poland and China
a year salmon facility – from idea phase to tender and basic design
12,000 tonnes
a year salmon facility – from idea phase to tender and basic design
completed in a process plant in operation
30+ tie-ins
completed in a process plant in operation

How I can help

From the first sketch to a plant in operation. I can take on the whole project, or the part where you lack capacity or experience.

Experience across industries

The method is the same whether it's a treatment plant, a wind component or a fish farm: clear requirements, control of the interfaces and a plan that holds.
  • Process and water treatmentWastewater treatment, treatment plants and tie-ins in live plants.
  • Land-based aquacultureRAS facilities in the USA, Norway and China.
  • WindComponents, tooling and lifting equipment for the wind industry.
  • Special machinery and productionRobots, handling equipment and production lines.
  • Energy and utilitiesPower demand, load profiles, grid vs. island operation.
  • Investment and due diligenceTechnical review and CAPEX validation.

Selected assignments

All cases →

Process and water treatment · 2025–2026

Novonesis

30+ tie-ins in a live plant

Tie-in manager · Kalundborg, Denmark / Poland

Responsible for 30+ tie-ins between the existing plant and new systems, carried out during operation with minimal disruption – as part of a wastewater treatment expansion worth more than DKK 2 billion.

  • Planned local plant shutdowns with a focus on safety, in close cooperation with operations
  • Managed 5 contractors and suppliers across piping, electrical and automation
  • Coordinated detailed design and fabrication of pipe components at Eurosteel in Poland
  • Walkdowns, P&ID reviews and quality assurance of critical installations
  • Turned the basic design into a prioritised plan with a visual overview

Land-based aquaculture · 2019–2025

AquaCon

Over USD 100 million

Engineering manager · Oslo / Maryland, USA

Greenfield facility for 12,000 tonnes of salmon a year – production concept and technical solution from idea phase to tender and basic design, including permits.

  • Production plans that formed the basis for sizing each production unit
  • Modular RAS design: instead of a new system for each life stage, one standard module large enough for economies of scale – biomass and feeding capacity was met by building the right number of modules
  • The gains of repetition: the same pumps and components in every module, faster construction because the same system is installed again and again, and a smaller spare-parts stock
  • Detailed tender documents and selection of technology suppliers
  • Link between US engineering and a European process supplier
  • Power supply and load profiles: grid connection vs. island operation on gas, biomass, solar and waste heat
  • Energy and mass balances, cooling demand and coordination of biogas and wastewater plants
  • Dialogue with US authorities on the discharge permit and participation in board meetings

Land-based aquaculture · 2024–2025

Atlantic Sapphire

Design review consultant · Florida, USA

Independent design review of one of the world's largest land-based salmon farms, with the findings presented to the board.

  • Identified critical bottlenecks affecting operation and capacity
  • Documented under-sizing and prepared turnaround proposals with prioritised actions
  • Report with concrete optimisations and quick wins for reliability and production

How I work

  1. 01

    Mature before it gets expensive

    The most important decisions are made early. I spend time on requirements, concept and risks before money is tied up in equipment and contracts.

  2. 02

    No over-engineering

    I deliver what is needed – and think one step further: will the solution still hold when capacity has to go up?

  3. 03

    Leads from the front and listens

    I take charge and find the solutions together with operations, contractors and management – so complex problems become clear decisions.

Latest from the blog

All posts →
David Enggaard Pedersen

Available for new assignments from 1 December 2026

Got a project?

Tell me briefly about the project and I'll get back to you within one working day – with an honest view on whether I'm the right fit.