Process and water treatment · 2025–2026

Novonesis

30+ tie-ins in a live plant

Tie-in manager · Kalundborg, Denmark / Poland

Responsible for 30+ tie-ins between the existing plant and new systems, carried out during operation with minimal disruption – as part of a wastewater treatment expansion worth more than DKK 2 billion.

  • Planned local plant shutdowns with a focus on safety, in close cooperation with operations
  • Managed 5 contractors and suppliers across piping, electrical and automation
  • Coordinated detailed design and fabrication of pipe components at Eurosteel in Poland
  • Walkdowns, P&ID reviews and quality assurance of critical installations
  • Turned the basic design into a prioritised plan with a visual overview

Land-based aquaculture · 2024–2025

Atlantic Sapphire

Design review consultant · Florida, USA

Independent design review of one of the world's largest land-based salmon farms, with the findings presented to the board.

  • Identified critical bottlenecks affecting operation and capacity
  • Documented under-sizing and prepared turnaround proposals with prioritised actions
  • Report with concrete optimisations and quick wins for reliability and production

Land-based aquaculture · 2024

Nordic Aqua Partners

Operations support · China

On-site support for the operation of biofilters and a Zero Water Change system.

  • Technical input that helped solve geosmin issues

Special machinery and robotics · 2023

Jørgensen Engineering

Mechanical engineer · Denmark

Embedded mechanical engineer in an engineering team under time pressure.

  • Cleared a substantial design backlog and completed critical designs
  • Restored momentum and supported higher capacity in the team

Wind · 2022–2023

Danhydra

Lead mechanical engineer · Denmark

Transport, tooling and lifting equipment for the wind industry – delivered on time and to the agreed quality in a time-critical project, in direct contact with the customer.

  • Split the work between three engineers and kept progress steady
  • Design optimisation together with foreign manufacturers
  • Third-party approval of the equipment
  • Storyboards for the customer on handling and use of the equipment
  • P-FMEA, D-FMEA, 3D/2D design and FAT/SAT material

Land-based aquaculture · 2019–2025

AquaCon

Over USD 100 million

Engineering manager · Oslo / Maryland, USA

Greenfield facility for 12,000 tonnes of salmon a year – production concept and technical solution from idea phase to tender and basic design, including permits.

  • Production plans that formed the basis for sizing each production unit
  • Modular RAS design: instead of a new system for each life stage, one standard module large enough for economies of scale – biomass and feeding capacity was met by building the right number of modules
  • The gains of repetition: the same pumps and components in every module, faster construction because the same system is installed again and again, and a smaller spare-parts stock
  • Detailed tender documents and selection of technology suppliers
  • Link between US engineering and a European process supplier
  • Power supply and load profiles: grid connection vs. island operation on gas, biomass, solar and waste heat
  • Energy and mass balances, cooling demand and coordination of biogas and wastewater plants
  • Dialogue with US authorities on the discharge permit and participation in board meetings

Wind · 2019

Danhydra

Mechanical engineer (via RAS-CON) · Denmark

Design and manufacturing documentation for a prototype of a modular turning gear for a wind turbine manufacturer – delivered on time.

  • The tool had to fit different gearbox interfaces
  • Modules that could be carried up into the nacelle and to the gearbox on site
  • Sized to deliver the required torque and to be safe in operation
  • Complete manufacturing documentation for the prototype

Investment and due diligence · 2019

Pareto Securities

Technical due diligence · Norway

Technical review of the Proximar case (AquaMaof RAS technology) ahead of an investment.

  • CAPEX validation
  • CO₂ analysis and design review

Wind · 2014–2018

Polytech A/S

Project manager and project engineer · Bramming, Denmark

Both project manager and engineer – design of products, machines and equipment for the wind industry.

  • Set up production of noise-reducing blade components (serrations) for LM Wind Power
  • Production line, acceptance catalogues, PFMEA and risk assessment
  • Chose production methods and auxiliary equipment that raised capacity while keeping quality